h4life Posted July 29, 2008 Share Posted July 29, 2008 just woundering how long it takes to yank out a bad and put in a new. thanx Link to comment Share on other sites More sharing options...
Reveeen Posted July 29, 2008 Share Posted July 29, 2008 Too many variables: On a hoist, with air tools, total time 4 1/2 hours, includes drive car in, do work, road test, park car. At home, on stands, using floor jack, electric impact, beer, 2X8 hour days. Link to comment Share on other sites More sharing options...
lmdew Posted July 29, 2008 Share Posted July 29, 2008 Then you're in PA rust add a day or two. I just did a 92 turbo sedan and it took 2x as long as a NA, just dealing with all the turbo stuff. Wires and all about 25 hours. Link to comment Share on other sites More sharing options...